2. Strengthen the toughness of power system
                    On March 3, 2022, due to the failure of Taipower equipment, some manufacturers in
                    the CTSP Park experienced a power voltage drop, but fortunately, there was no serious
                    impact on the production line. In response to various power accidents, the bureau has
                    already handled the power quality improvement plan in the Park, discussed the power
                    quality of the park, and carried out research and analysis. From the power supply side
                    of power plants, transmission and distribution, substations and the power equipment
                    of the park manufacturers, the improvement countermeasures were proposed, which
                    can optimize the power quality of the park and improve the reliability of power supply
                    stability.


                    In the future, a smart grid will be built in the newly-built park, and the practice of
                    promoting and advising the park manufacturers to apply smart grid is put forward. At
                    present, 15 factories in the park have completed the construction of energy management

                    systems, among which the introduction penetration rate of manufacturers with
                    electricity consumption above 25,000KW in the park is 100%. In addition, the bureau
                    evaluates the feasibility of setting up an energy storage demonstration site by itself or
                    cooperating with manufacturers. At present, the cumulative amount of energy storage
                    system built in grid-connected 6.8MWh has been submitted to Taipower for impact audit.






                                       Intensive planning


                                       CTSP Bureau continues to cooperate closely with Taipower, and
                                       holds power quality improvement meetings with the industrial
                                       associations and manufacturers in the park. When power accidents
                                       (such as voltage drop and power failure) affect the power supply of

                                       the factory owners in the park, the bureau immediately coordinates
                                       Taipower to find out the cause of the accident and restore it as soon
                                       as possible. At the same time, it understands the affected situation
                                       of the factory owners in the park through mechanisms, reviews the
                                       cause of the accident and studies the improvement measures of the
                                       factory owners to reduce the impact of the power supply accident.


                                       The Bureau will continue to cooperate with the terms of large power
                                       users, encourage manufacturers to expand the construction scale
                                       of developing self-use electricity as much as possible, and plan new
                                       parks and newly leased land to build factories in the future, requiring
                                       advanced process semiconductor manufacturers to obtain 20%
                                       renewable energy, and it is estimated that 100% renewable energy
                                       will be used in 2050.