Page 68 - 2023年中科VDR報告書_英文版
P. 68
Ensure that everyone can enjoy affordable, stable,
Core Goals 7
sustainable and modern energy
Corres- Core goal approach Customized tracking indicators
ponding to (2022-2023 (customized short, medium and Unit
specific goals performance) long-term goals)
7.2 Improve From 2022 to 2023, a Short-term goals (2024~2025)
the capacity total of about 7.419MW ◉ ◉ By 2025, the cumulative solar photovoltaic
of renewable of solar photovoltaic installation will reach 76.77MW.
energy devices power was added, which General
Medium and long-term goals (2030)
made the cumulative Affairs
◉ ◉ Continuously respond to the rolling
capacity of solar power Division
adjustment of the "solar photovoltaic
generation devices in
plan" launched by the Executive Yuan.
CTSP Park exceed 59MW
by the end of 2023.
Challenges/opportunities faced
In response to the impact of climate change, the world has set off a trend of net zero
carbon emission and accelerated the construction of renewable energy. In response to
the central government's "Green Roof Plan" policy, this bureau has jointly promoted solar
power generation with park manufacturers, adding a total of about 7.419MW of solar
photovoltaic devices from 2022 to 2023, so that the cumulative capacity of CTSP solar
power generation devices has exceeded 59 MW by the end of 2023.
However, with the decrease of free roof area, it is not easy to set up solar photovoltaic
systems in the future. Moreover, due to the active energy transformation in our country,
intermittent renewable energy has also had a certain impact on the stability of the
traditional power system, and it still depends on the upgrading of the national grid to
meet the needs of rapid change and decentralized dispatching of renewable energy.
Specific actions and promotion highlights
Stabilize Park Power Other core
Supply targets involved
66
66

