Page 69 - 2023年中科VDR報告書_英文版
P. 69
Vision : Sustainable Park
Implementation content and promotion results
1. Energy Saving, Energy Creation
In order to achieve the goals and requirements of the Executive Yuan's energy-saving and
carbon- reduction project, this Bureau implemented power-saving measures including
replacing power- saving lamps, controlling the number of light sources in the Bureau
according to the time of use, replacing a total of 560 sets of LED grille-type lamps (2 feet
and 4 lamps) , and using air conditioners, set the indoor air-conditioning temperature to
26-28 degrees, increased the ice melting temperature and shorten the air-conditioning
opening time. The annual electricity consumption has been decreasing year by year
from 2.02 million kWh since 2009. According to statistics, the total annual electricity
consumption of 2022 and 2023 is 1.64 and 1.67 million kWh, compared with 2009, with
an annual decrease of 18.6% and 17.3%.
CTSP Bureau carries out statistics, management and dispatching of water and electricity
consumption for users in NSTC Science Park in accordance with the Measures for the
Control of Water and Electricity Counseling. In order to alleviate the overall electricity
consumption increasement of the park, the bureau continues to provide counseling and
publicity on electricity saving. Since 2014, CTSP Bureau has continuously implemented
on-the-spot energy-saving guidance for park manufacturers and has handled 42 sessions
so far. With an energy saving potential totaling 125,579 MWh per year, and potential
annual energy saving increase target of 4.3 MWh. The water consumption data of the
park in the past three years are as follow:
Project/Year 2021 2022 2023
Electricity consumption(kWh) 12,281,819,084 12,667,840,733 12,468,529,254
Electricity consumption (GJ) 44,214,549 45,604,227 44,886,705
Power consumption intensity
4,271 3,898 4,783
(GJ/ NT$ 100 million)
Note: The turnover in 2021 was NT$ 1,035 billion, NT$ 1,169 billion in 2022 and NT$ 938.4 billion in 2023.
In response to the "Solar Photovoltaic Project" launched by the Executive Yuan, CTSP
and the Park manufacturers are committed to promoting solar power generation,
making good use of the existing Park plant construction area, making the most
effective space planning and utilization between land and buildings, and improving
the environment to practice the concept of symbiosis between the science Park and
the land, and gradually to promote the diversification of energy and sustainability
development. On November 8, 2023, the "Solar Photovoltaic Installation Promotion and
Information Seminar and Matchmaking Meeting" was held to encourage manufacturers
in the Park to strengthen the installation of solar photovoltaic facilities. By the end of
2023, the total installation capacity of the park will be 59.93MW.
67

