The bureau sets up a toll-free environmental complaint hotline 0800-777795 to provide
                    24-hour service, and conducts on-site inspections and handling operations. In 2022-
                    2023, it accepted 13 complaints from the public, including 7 complaints about air
                    pollution, 4 complaints about noise, 1 complaint about water pollution and 1 complaint
                    about waste. The bureau immediately handled the complaints after receiving them. All
                    the complaints in 2022-2023 have been closed.


                 2. Centralized sewage treatment

                    All CTSP parks have established a perfect rainwater and sewage diversion sewer
                    system, and the acceptance rate of industrial sewage in the park reaches 100%. The
                    wastewater is properly treated by the sewage treatment plant and discharged only

                    after it meets the national discharge water and environmental impact assessment
                    standards. The rainwater sewer system not only collects rainwater in public areas, but
                    also manufacturers must design rainwater collection pipelines when building factories,

                    and set rainwater discharge ports to be incorporated into the rainwater sewer system,
                    which will be discharged into the flood detention basin in the park and then merged into

                    the receiving water body. The Bureau also regularly arranges sampling inspection plans
                    for sewage and sewer systems in various parks to understand the system conditions and
                    ensure the normal water quality.



                 Sewer rainwater and                                                  Inlet discharge
                   sewage diversion                                                        water
                                       Management of
                                                                Sewage treatment
                                       industrial wastewater in
                                                                in the park
                                       the park
                                       Rainwater collection
                                                                Park flood
                                       and discharge special
                                                                detention pond
                                       sewer for rainwater



                    The sewage treatment plants in the park are all three-stage treatment systems, adopting
                    standard biological treatment units of activated sludge (AO biological nitrogen removal

                    system and contact aeration method adopted by Taichung and Houli sewage plants), and
                    adding chemical coagulation and physical filtration treatment units in subsequent units to
                    improve the treated water quality and reduce the impact on the bearing water body.


                    The operators of Zhongxing Park are mainly research and experimental industries, and
                    no process wastewater is generated. The laboratory wastewater from the manufacturers

                    in the park is cleared and treated by qualified manufacturers, and the domestic sewage
                    is brought into the sewage sewer of the park and transported to Zhongzheng Road
                    Sewage Treatment Plant for proper treatment and then discharged.