Page 59 - 2023年中科VDR報告書_英文版
P. 59

Vision : Sustainable Park



                      etc., with a total of 4,338 points/times from 2022 to 2023. The environmental monitoring
                      results of our bureau are all open and transparent, and published on the CTSP Park
                      Environmental Information Integration Network for public browsing.


                      In order to further understand the current situation of environmental factors other than
                      environmental assessment documents, the bureau added some supplementary monitoring
                      items from 2022 to 2023, including air quality, noise and vibration, water quality of
                      discharged water, surface water quality and groundwater quality, and conducted a total of
                      1,169 additional environmental monitoring points/times from 2022 to 2023.













                      Environmental quality monitoring   Environmental Quality         Noise and vibration
                         - photochemical monitoring   Monitoring-Houli Park-Qixin Base
                          station in Taichung Park   General Air Quality Measuring
                                                              Station












                          Discharge water quality       Surface water quality         Groundwater quality












                            River bottom mud                Soil quality               Agricultural implant


                      In addition, in order to improve the reliability of monitoring data, the Bureau also carried
                      out parallel monitoring in 2022-202 3, including general air quality, acid and alkali gas,
                      odor, flue detection (including night detection), water quality of civilian wells and other

                      items, and carried out synchronous testing from time to time to ensure the quality of
                      monitoring data. At the same time, in order to understand the night emission situation
                      of manufacturers, it conducted six flue spot night checks in 2022-2023 together with the
                      Environmental Protection Supervision Subcommittee (local leader). It is hoped that the
                      impact of park operation on the environment can be truly understood through irregular
                      testing.



                                                                                                                57
   54   55   56   57   58   59   60   61   62   63   64