                     get                                       gress  2022      2023     2021      2030
                           100% of the discharged water from the
                           sewage plant meets the standard, and
                     6.3   the water quality of surface water is   ●  100%      100%     100%      100%
                           regularly inspected and monitored every
                           year.

                            Continue to coach park manufacturers
                           to save water and electricity. Achieve
                           85% recovery rate of process water   ●     91.4%    91.9%     91.1%     86%
                           for semiconductor and optoelectronic
                           industries in each park.
                     6.4
                6          In the initial operation of Erlin Park, a
                           set of reclaimed water treatment system
                                                                                        Not yet
                           has been set up, with a treatment         11,530.2   46,447.6         3,574,810
                                                                ●                        opera-
                           capacity of 600CMD, which can treat the     M 3       M 3                M 3
                                                                                         tional
                           sewage that entered the factory at the
                           initial stage.
                                                                     Off-site resource
                           The total amount of waste permit
                                                                     only: 96.1%
                           applications is controlled, and the
                                                                     (Including the ratio
                     6.e   recycling rate of waste remains above   ●                    94.15%    94.15%
                                                                     of on-site and off-
                           90% * (higher than the indicators 6.e.3
                                                                     site resources:
                           and 12.4.3).
                                                                     96.75%)
                           From 2022 to 2023, a total of about
                           7.419MW of solar photovoltaic devices
                           were added, which made the cumulative                                  Rolling
                7    7.2                                        ●     56MW     59MW      52MW
                           capacity of solar power generation                                   adjustment
                           devices in CTSP Park exceed 59MW by
                           the end of 2023.

                           Continue to promote the review of
                           subsidy cases for innovative technology
                     8.2                                        ●    18 cases  13 cases  13 cases  10 cases
                           research and development plans, and
                           subsidize at least 10 cases every year.

                           We will continue to provide subsidies for
                           cooperative training courses between
                           industry and university (Talent Training     12       13       12        10
                                                                ●
                8          Grant Scheme in Science Park), and        courses   courses  courses   courses
                           subsidize at least 10 module courses and
                           enterprise internship courses every year.
                     8.6
                           Continue to handle the training of
                           science and technology manpower in
                           the park (professional and technical   ●  282 hours 300 hours 258 hours 300 hours
                           personnel training plan), and offer at
                           least 300 hours of courses every year.